New Pressure Swing Adsorption (PSA) Unit

Client: Hellenic Petroleum (HELPE) / Thessaloniki Refinery| Country: Greece| Period: 2011

Project Description:

The new Pressure Swing Adsorption unit (PSA) is located in the adjacent area of the existing H2 plant block in Thessaloniki Refinery.

The unit is used to upgrade the purity of the hydrogen (based on the adsorption capability of activated carbon) coming from the new Naptha reformer and sent to the Polypropylene Plant.

The unit will deliver a hydrogen flow rate of 380 m3/h at 99,5% purity.

Provided Services:

ASPROFOS provided:

  • Project Management
  • Bid Preparation for the design & manufacturing of the main package unit
  • Detailed design of interconnecting facilities
  • Procurement Services
  • Construction Supervision

Photo Gallery: