Fuel Oil Circuit for Refinery Boilers and Heaters
Client: Hellenic Petroleum (HEL.PE.) / T.I.C. | Country: Greece| Period: 2005
Project Synopsis::
Project called for replacement of obsolete facilities with new equipment which included one crude storage tank, one crude circulation pump, three supply pumps to the furnaces and boiler, two pre-heating heat exchangers, two oppressing filters and two suction filters, along with the required piping, instrumentation and electrical equipment auxiliary items. The new circuit was designed for a capacity of 160100 Kg/h of No3 Heavy Fuel Oil, feeding the furnaces and the boilers at a temperature of 100 0C.
ASPROFOS services::
- Site preparation study
- Detailed process engineering, full Detailed Engineering Design, including interconnection requirements.
- All construction and erection activities (e.g. structural, mechanical, electrical, instrumentation, insulation, painting etc.) the relevant supervision, field inspection, testing and warehouse set-up and follow-up activities
- Procurement services (purchasing, inspection, expediting, delivery at site) of all required materials
- Mechanical, instrument and electrical tests, pre-commissioning and commissioning of the circuit, start-up and performance tests