Revamping of CCR Reformer

Client: Hellenic Petroleum (HELPE) / Aspropyrgos Refinery| Country: Greece| Period: 2004

PROJECT SYNOPSIS

PROJECT DESCRIPTION

The purpose of the revamping was to produce a 101.5 RON clear reformate for a processing capacity of 165 m3/h  of Naphtha feed, with a continuous catalyst regeneration and circulation section. The Unit is located in the HEL.PE Refinery in Aspropyrgos.

The Basic Design was performed by AXENS. Technip was involved in the project as a subcontractor for ASPROFOS for the execution of the Front End Engineering (FEED).

ASPROFOS SERVICES

The scope includes the complete detail engineering for the realization of the revamping of the Unit-3300 CCR reformer, based on the process Data Books issued by AXENS. During the duration of the Project A.F. provides the following Services:

  • Project Management – Q.A. Plan, collaboration with HEL.PE
  • Project Engineering – Develop EFD’s, Equipment list, Line List, Tie in List, Erection Requisition, General Engineering Co-ordination
  • Project Control – Engineering & Procurement Schedule, Follow-Up, monthly progress reporting, Cost Estimating.
  • Process – Process Data Books review, EFD’s review, Utilities Header Sizing, Critical Lines Checking, Operating Manuals, Support to Engineering.
  • Detailed Engineering and Drafting – Civil, Electrical, Instrument, Machinery, Piping, Stress Analysis, Technological.
  • Procurement – Vendors Lists, Inquiry Documents, Purchase Orders, Inspection & Expediting.
  • On site during the construction and shut – down phase ASPROFOS supplied construction supervision, planning and support to construction supervision services at the Aspropyrgos Refinery.