Combined Cycle Power Station 400 kV
Client: Ενεργειακή Θεσσαλονίκης| Country: Ελλάδα| Period: 2005
It concerns a Combined Cycle Power Station Unit installed at Sindos of Thessaloniki area having a power capacity of 390 MW.
ASPROFOS undertook, on behalf of the Owner, the following services:
- Management
- Detail Engineering Follow-up
- Construction Supervision
- Contacts with Authorities for Production and Installation Permit Issue
- Environmental Impact Study
- Basic Design of Unit Interconnecting