Combined Cycle Power Station 400 kV

Client: Ενεργειακή Θεσσαλονίκης| Country: Ελλάδα| Period: 2005

It concerns a Combined Cycle Power Station Unit installed at Sindos of Thessaloniki area  having a power capacity of 390 MW.

ASPROFOS  undertook, on behalf of the Owner, the following services:

  • Management
  • Detail Engineering Follow-up
  • Construction Supervision
  • Contacts with Authorities for Production and Installation Permit Issue
  • Environmental Impact Study
  • Basic Design of Unit Interconnecting